Vermillion River Greenway (Hastings)

Dakota County recently approved a master plan for a greenway corridor through Hastings, connecting the Mississippi River Regional Trail to trails along the Vermillion River. This page contains information about the planning process.

The County Board Adopted Vermillion River Greenway (Hastings) Master Plan (18mb PDF) is available to view.

A Public Open House was held on Thursday, March 14, 2019, at Hastings City Hall. Click here to download the two-page brochure and learn more. Public comments were accepted on the Draft Master Plan during June and July of 2019. A summary of comments received can be found in the Master Plan's appendix.

 

 

Meeting Materials

Vermillion River Greenway-Hastings Master Plan Introductory Brochure (PDF, 11x17, double-sided)

Vermillion River Greenway-Hastings Introductory Presentation November, 2018 (PDF)

Vermillion River Greenway-Hastings Introductory Presentation (powerpoint version)

Vermillion River Greenway-Hastings Technical Advisory Group Meeting #2 Presentation February 5, 2019 (PDF)